Forza FX1 Future Factory

Forza X1 has 14.5 acres of undeveloped land under contract in Fort Pierce, The parcel is currently being designed as the future boat manufacturing facility for Forza to build its electric boats. The  land would afford us the necessary space to construct a 100,000 square foot manufacturing facility designed from the ground up to build our fully electric boats at greater capacity than we could at Twin Vee’s current facility. Forza X1 intends for the planned manufacturing facility to be better equipped to meet future demand for Forza X1’s boats by increasing production capacity and streamlining the manufacturing process.

The 100,000 square foot facility will be a dedicated Lean Manufacturing factory designed for capacity and production of 1,000 units annually, including the fiberglass manufacturing process for our FX1 boat and the manufacturing and assembly of our integrated FX1 motor.

Forza X1 will be utilizing modern boat building and assembly technologies throughout the FX1 manufacturing process to streamline efficiencies, reduce waste, lower costs and support a safe and healthy work environment for our employees. 

Multiple technologies are expected to be employed incrementally as volume and throughput needs increase, including 3D printing, robotic gel-coating and cutting, and ergonomically designed material handling equipment.